Circuit breaker selectivity means clearing an overcurrent with the protective device closest to the affected circuit while keeping the healthy parts of the installation supplied. A higher upstream ampere rating alone does not prove it. The review needs the exact breaker pair, trip-unit settings, system voltage, available fault current and suitable coordination evidence. For an industrial panel, establish the required continuity boundary first, then check whether the selected combination meets it across the relevant operating conditions. This guide explains the evidence to request and the checks to record; it does not supply settings for an unidentified installation.
Define which circuits must remain available
Start with a one-line diagram and mark the proposed fault location. Identify the branch breaker expected to open, the upstream breaker expected to remain closed and the other loads that share that upstream supply. A statement such as “maintain the adjacent pump feeder during a fault on this branch” is easier to verify than “provide good discrimination.” Also identify whether a process controller, auxiliary transformer or communications supply would disappear with either breaker.
Continuity requirements come from the project specification and applicable rules. Requirements differ between ordinary process circuits and particular emergency or essential systems, and between jurisdictions. Do not copy a code conclusion from an article without checking the adopted edition and installation classification. The IAEI discussion of selective coordination and arc-flash studies explains why those questions belong in the design review.
For a panel using a WCM9 moulded-case circuit breaker, confirm the precise frame, trip unit and supplied options. A family name or exterior photograph is useful for identifying the product range, but cannot establish a tested upstream/downstream pairing. Ask for documents matching the actual proposed devices before approving a continuity claim.

Separate selectivity from interrupting capability
Interrupting capability asks whether a protective device can safely interrupt the relevant fault at its specified voltage and conditions. Selectivity asks which devices operate when that fault occurs. A pair can have adequate interrupting ratings and still disconnect more of the installation than intended. Conversely, an appealing separation between trip curves does not excuse an inadequate interrupting rating.
Keep these decisions on separate lines of the review sheet. First confirm the individual or otherwise specifically permitted combination ratings against the short-circuit study. Then examine the operating relationship. Our guide to circuit breaker breaking capacity addresses the rating comparison; the present guide addresses the additional continuity question. Neither decision should be inferred from the other.
Cascading, backup protection and series-rated arrangements require their own exact combination evidence and applicable installation conditions. They are not synonyms for selectivity. If a supplier submits a table, read its title, scope and footnotes before using a number from it. Ask whether the table establishes interruption performance, selective operation or another characteristic, and retain that answer with the submittal.
Assemble a usable device-pair record
Record the upstream and downstream catalog references in full, including trip-unit versions and adjustable protection functions. Capture settings as actual quantities with units, and also retain the basis used by the adjustment scale. A dial marked as a multiple of a setting cannot be interpreted correctly if the reference setting is missing.
Add system voltage, frequency, number of poles and the relevant supply arrangement. Record the maximum available fault current at the applicable locations, with the study revision and assumptions. Identify alternate operating modes such as a generator or bus tie. A pair that is acceptable under one supply arrangement should not silently inherit approval under every other arrangement.
Use this evidence checklist during design review. It is a qualitative document-control aid, not a substitute for a protection study. The technical distinction between curves and manufacturer pairing evidence is discussed in IAEI’s inspection guide to selective coordination.
| Review item | Evidence to obtain | Reason to return the submission |
|---|---|---|
| Device identities | Complete upstream and downstream references and trip units | Only a product family or current rating is supplied |
| Supply conditions | Voltage and fault-current study for each relevant mode | Utility-only evidence is used for an unreviewed alternate source |
| Adjustable settings | Approved setting schedule with units and tolerances | Dial positions have no documented reference basis |
| Operating relationship | Applicable curves and any required tested pair table | Table concerns backup protection rather than selectivity |
| Design boundary | Stated continuity requirement and fault locations | “Fully selective” has no defined scope |
| Handover | Installed-device check and controlled setting record | The installed trip unit differs from the approved one |
Read curves with the right questions
A time-current plot relates current magnitude to protective-device operating time. Compare the appropriate device characteristics over the relevant current range rather than looking only at the normal load point. Include tolerance bands and the meaning of the published curves. Distinguish a trip-unit characteristic from total clearing information when the documentation makes that distinction.
Where the curves approach one another, identify the range that requires additional evidence. Do not tidy the plot by hiding bands or selecting a convenient nominal line. The purpose is to locate uncertainty, not to produce an attractive drawing. A review comment should identify the devices and current region that need clarification so the supplier can respond with the correct data.
Fast fault interruption and current-limiting behavior can require manufacturer coordination information beyond a simple visual comparison. The IAEI explanation of overcurrent protective-device coordination describes the use of such evidence. Avoid inventing a universal current ratio or time gap that supposedly proves every breaker pair selective.
Interpret a selectivity limit in context
A published limit is meaningful only with its matching devices, conditions and explanatory notes. Copy the table row, column headings, footnotes and document revision into the approval record. A cropped screenshot containing one number is poor evidence because the reviewer cannot determine which voltage, trip setting or device construction it belongs to.
If the documentation establishes selectivity only up to a stated current, compare that boundary with the relevant study result. Do not rename partial coverage as complete coverage. Where a continuity requirement is not met, the project engineer may need to reconsider device choice, protection architecture or the distribution arrangement. The supplier should explain the proposed resolution rather than simply increasing a rating on a quotation.
For example, imagine a submission includes matching device references but no generator-mode study. The correct review outcome is “utility-mode evidence received; alternate-mode assessment outstanding.” There is no basis for inserting an assumed current or granting unconditional approval. This example illustrates evidence handling, not the performance of any LINECOME breaker.

Do not improve continuity by weakening protection
Changing an upstream delay affects more than the relative order of two trips. The design must still protect conductors and equipment and address the applicable thermal, short-time withstand and incident-energy considerations. A coordination change therefore belongs in the controlled engineering review, with the affected studies updated as necessary.
Never recommend raising an instantaneous pickup or extending a delay solely because a nuisance outage occurred. First establish the actual event and fault location. Check whether the reported upstream opening was an overcurrent operation, a release command or another mechanism. Our comparison of shunt trip and undervoltage release helps distinguish control-driven opening from the overcurrent relationship under review.
Similarly, a breaker indication does not by itself identify the initiating condition. The guide to auxiliary and alarm contacts explains why feedback definitions matter. Include event timestamps and the protection indication in a fault review, while keeping the original records intact. A reset or replacement should not erase the evidence needed to understand what operated.
Verify the installed panel against the approved study
At handover, compare installed labels and trip units with the approved schedule. Record discrepancies before energization decisions are made. A replacement breaker with the same nominal current may have a different trip characteristic, and a firmware or trip-unit change can require a fresh document review. Keep the final settings accessible to the people responsible for maintaining the installation.
A qualified commissioning team should follow the approved test procedure using suitable equipment. Functional or injection testing can help verify specified device functions and settings within the procedure’s scope. It is not an on-site recreation of a manufacturer’s high-current selectivity test. Do not create a real short circuit to demonstrate that one breaker opens first.
Review who is allowed to change protection settings and how changes are logged. A useful record includes the approved schedule revision, installed serial references, verification results, responsible reviewer and outstanding exceptions. If a setting must temporarily change during an authorized activity, the restoration and its verification need the same control as the initial change.
Request a quotation that includes the evidence
Send the supplier the one-line diagram, relevant load information, supply conditions, fault-current study and required continuity boundary. Ask for a proposed device list, trip settings, applicable coordination documents and explicit exclusions. Request a statement about each operating mode rather than a broad assurance that the panel is coordinated.
For an existing installation, include photographs of labels and the current setting record, obtained safely under the site’s procedures. Identify planned feeder additions and changes to the supply. A previous study can be a starting point, but its assumptions must still match the system being purchased or modified.
The practical deliverable is a traceable approval package: the right devices, the right settings, the right evidence and a clear account of what remains unverified. That package helps procurement compare offers on equal terms and helps maintenance avoid substitutions that unintentionally change the protection relationship.
Further learning: how a circuit breaker operates
The RealPars lesson below explains the operating principles behind breaker action. It provides background for reading protection documents; it does not prove a device pair selective or replace a project-specific study.
Video by RealPars. Watch Circuit Breaker Explained | Working Principle on YouTube.
Frequently asked questions
Does a larger upstream breaker guarantee selectivity?
No. Nominal current alone does not establish the operating relationship. Verify the exact devices, trip characteristics, settings, applicable manufacturer pairing evidence and relevant system conditions against the required continuity boundary.
Can a time-current plot prove every breaker combination selective?
No. A plot is an important part of the assessment, but particular fast-operating or current-limiting combinations can require applicable manufacturer test tables. Use documents matching the actual device pair and conditions, with their limitations recorded.
Must selectivity be checked after a breaker replacement?
Review the replacement against the approved study and schedule. A matching ampere rating is insufficient if the frame, trip unit, characteristics or settings differ. Have the responsible engineer determine whether updated coordination evidence or studies are required.